Oak's Beautiful Contemporary Suite #04

Lawton, OK, United States

2 guests
1 bedroom
1 bathroom

Welcome to Oak Corporate Suites, a beautifully remodeled and fully furnished contemporary 1-bedroom suite in Lawton, Oklahoma. Designed for comfort, convenience, and an easy stay, this private suite is ideal for business travelers, Fort Sill visitors, couples, extended stays, and guests exploring Southwest Oklahoma. 10 mins to Ft. Sill key gate 15 mins to Lawton- Ft Sill Regional Airport 20 mins to Medicine Park

Good to know

The suite is fully furnished and thoughtfully stocked with the everyday essentials you may need during your stay. Enjoy a private bedroom, comfortable living area, Fully Equipped kitchen, Wi-Fi, Ethernet connection, TV, central heating and air conditioning, and free on-site parking. All the Suites are ground floor. We do not have any stairs.

Other Details to Note

We take great care in providing fresh, clean linens and towels for every guest. Please help us maintain their quality by treating them with care. Guests may be charged the replacement cost for towels, sheets, or other bedding that are returned with excessive stains, damage, or are missing.

What this place offers

Common

  • Air conditioning
  • Cooking basics Pots and pans, oil, salt and pepper
  • Dishes and silverware
  • Essentials Towels, bed sheets, soap, toilet paper, and pillows
  • Hair dryer
  • Heating Central heating or a heater in the listing
  • Kitchen Space where guests can cook their own meals
  • Dedicated workspace
  • TV
  • Washing Machine In the building
  • Wifi

Kitchen and dining

  • Baking sheet
  • Blender
  • Coffee
  • Coffee maker
  • Dishwasher
  • Freezer
  • Hot water kettle
  • Microwave
  • Oven
  • Refrigerator
  • Stove
  • Toaster

Bedroom and laundry

  • Bed linens
  • Iron

What this place offers

Common

  • Air conditioning
  • Cooking basics Pots and pans, oil, salt and pepper
  • Dishes and silverware
  • Essentials Towels, bed sheets, soap, toilet paper, and pillows
  • Hair dryer
  • Heating Central heating or a heater in the listing
  • Kitchen Space where guests can cook their own meals
  • Dedicated workspace
  • TV
  • Washing Machine In the building
  • Wifi

Kitchen and dining

  • Baking sheet
  • Blender
  • Coffee
  • Coffee maker
  • Dishwasher
  • Freezer
  • Hot water kettle
  • Microwave
  • Oven
  • Refrigerator
  • Stove
  • Toaster

Bedroom and laundry

  • Bed linens
  • Iron

Bathroom

  • Bidet
  • Body soap
  • Conditioner
  • Hot Water
  • Shampoo
  • Shower gel

Home safety

  • Carbon monoxide detector
  • Fire extinguisher
  • First aid kit
  • Smoke detector

Heating and cooling

  • Ceiling fan
  • Portable fans

Services

  • Cleaning before checkout
  • Long term stays allowed Allow stay for 28 days or more

Family

  • Crib

Entertainment

  • Ethernet connection

Parking and facilities

  • Free parking on premises Free, on premises
  • Private living room

Outdoors

  • Garden or backyard

Accessibility and Availability

Neighborhood

Guest Access

Guests have private access to the entire 1-bedroom suite, including the bedroom, living area, kitchen, bathroom, and dedicated workspace. You will also have access to: Free on-site parking. The laundry room in located in the back 2 door small building laundry room is on the left. Laundry room entry code: 1435 Credit card-operated washers and dryers Keurig coffee makers, coffee pods, and additional guest supplies located in the laundry room Extra towels located in the bedroom closet The suite has its own private entrance, so you can come and go comfortably during your stay.

Find us

Lawton, OK, United States

Sorry we're unable to show you the location for this property

Approximate location. Full address will be provided on booking.